TAT Spread PLST Corrective Maintenance

Turbine Repair

Location

Afam Power Plant

Date

March 2025

Duration

12 days

Client

FIPL

Project Overview

The GT13E2 Gas Turbine (180MW) was experiencing output limitations, which restricted its power output to 90MW for over 3 months, due to increasing Turbine After Temperature (TAT) spread. UNITRITECH intervened, inspecting and repairing the EV Burners and FDS, restoring the unit to baseload capacity within 12 days of mobilization to site.